Knit Fabric Supplier Lead Time and Capacity: How to Compare Sample, Custom-Dye and Bulk Timelines

Nov 04, 2026
Table of Contents

Quick Answer: compare knit fabric suppliers on three separate lead times — lab dip, sample and bulk — and on what each one includes, not on a single headline figure. Then score each supplier on capacity for your construction, MOQ, pilot runs, repeat-order timing, customization and shipping, and ask for documents that support each answer. Treat published ranges as a guide and rely only on dates written into a confirmed order.

Sample, Custom-Dye and Bulk Lead Times: What Each Includes

Lead timeWhat it includesClock startsClock stopsRuntang published range
Stock sampleCutting and sending an existing fabric sampleSample requestDispatchA4 size samples available
Lab dip (custom dye)Dye recipe development and colour submission on the target fabricColour standard and fabric confirmedLab dip submitted3–7 days
PP sampleKnitting, dyeing and finishing a pre-production sample to the approved colour and specLab dip approvalPP sample submitted15 days; a second PP round adds 10–15 days
BulkYarn, knitting, dyeing, finishing, inspection and packing of the order quantityPP sample approvalGoods ready for shipment25–45 days

Runtang figures checked on runtangtex.com on Nov 04, 2026 (product pages and guides dated May 2026). They are typical published ranges, not commitments for a specific order.

Runtang's interlock sourcing guide puts the full sampling stage, from first colour submission to PP sample approval, at 3–5 weeks depending on revision rounds. Shipping transit is separate from all of the above.

What Changes a Lead Time

  • Construction: standard constructions on running machines move faster than new ones. Custom jacquard or cable patterns need dedicated machine programming, see jacquard knit fabric.
  • Colour: navy, black, nude and grey-adjacent shades often need more lab dip rounds; each round adds time. See our lab dip workflow guide.
  • Finishing: brushing, raising, mineral or enzyme wash and other special finishes add process steps and may need a post-finish sample for approval.
  • Volume: larger orders run across several dye lots, each needing its own shade band approval before release, as explained in our knit fabric quality control guide.

Typical Ranges vs Confirmed Commitments

AspectTypical published rangeConfirmed commitment
Where it appearsProduct pages, guides, first quotesSigned order or proforma invoice
When it is givenBefore samplingAfter lab dip and PP sample approval
What it assumesA standard construction, colour and volumeYour fixed construction, colour, finish and quantity
How to use itShortlist suppliers and plan the seasonBook production and shipping

Runtang's own guides state that its lead times are typical reference ranges to be reconfirmed after lab dip or PP sample approval.

Knit Fabric Supplier Scorecard

Fill in one column per supplier using the evidence column, not verbal answers.

CriterionQuestion to askEvidence to requestRuntang published position
CapacityCan you knit and dye my construction in my volume and window?Machine types and gauges for the construction, dyeing route, current loading for the delivery windowOwn factory with 400+ textile machines per our homepage; capacity for your fabric is confirmed per enquiry
MOQWhat is the minimum per order and per colour?MOQ in writing for stock, custom colour and custom developmentStock from 25 kg; custom solid from 300 kg per colour; custom development from 1,000 kg
Pilot runsCan a small trial lot be produced before full bulk?Trial lot quantity, price and timing in the quotePP sample stage before bulk; trial lot quantities agreed per order
Repeat-order timingHow fast can a reorder ship, and is the recipe retained?Recipe record reference and reorder lead time in writingReorder timing confirmed per order; our guide lists the records to confirm before a reorder (dye ratios, auxiliary products, process curve), see recipe and reorder control
CustomizationWhich parameters can be changed?Feasibility notes on GSM, width, fibre blend, colour and finishCustom development for jersey, rib, fleece, interlock and other knits; see custom knit fabric development
ShippingWhich terms, ports and documents?Incoterm, port of loading, packing list and test reportsSupplies apparel brands in Europe, North America and Australia; terms agreed per order

Runtang figures checked on runtangtex.com on Nov 04, 2026 (product pages and guides dated May 2026). They are typical published ranges, not commitments for a specific order.

Evidence to Request Before You Commit

  • Lead time breakdown by lab dip, PP sample and bulk, with the start event for each
  • The number of revision rounds the quote assumes
  • Machine and dyeing route for your construction and colour
  • Production records or packing lists from a recent order of a similar fabric
  • MOQ per colour and per construction in writing
  • Recipe retention and reorder procedure
  • Inspection report and lab test report samples, see our QC documentation guide
  • Certificate number and scope if certified fabric is required, see our traceability verification guide

To get Runtang's dates for your fabric, send us your construction, GSM, colours, quantity per colour and target delivery. You can also review the knit fabric sample approval checklist to plan the sampling stage.

FAQ

How should I compare lead times between knit fabric suppliers?

Ask every supplier for the same three figures stated separately: lab dip, sample (or PP sample) and bulk, plus the event that starts each clock. A single 'lead time' figure hides whether sampling, dyeing or finishing is included. Compare like for like on the same construction, colour and volume, and ask how many revision rounds the quote assumes.

What evidence should I request to check a fabric supplier's capacity?

Ask for the machine types and gauges that can knit your construction, the dyeing route for your colour, current order loading for your delivery window, and production records from recent orders of a similar fabric and volume. A factory-wide output figure says little about capacity for your specific fabric.

Is a supplier's published lead time a delivery commitment?

No. Published lead times are typical ranges. The commitment is the delivery date written into your confirmed order after lab dip and PP sample approval, once construction, colour, finishing and quantity are fixed.

What are Runtang Tex's published lead times and MOQ?

Runtang Tex's fabric product pages list a lab dip lead time of 3–7 days, a PP sample lead time of 15 days and a bulk lead time of 25–45 days. Stock fabrics start from 25 kg, custom solid colours from 300 kg per colour, and custom development from 1,000 kg. Dates are reconfirmed for each order after sample approval.